THE OLD SCHOOL, KENNEDY WILSON

Retaining period details whilst executing new concepts

THE PROJECT

Won in competitive tender we took the architect’s conceptual designs and detailed them into the design and build of a Grade II listed building in Leeds.

CLIENT: KENNEDY WILSON
PROJECT: CAT A
DURATION: 28 WEEKS
CONTRACT: DESIGN & BUILD

HOW WE DID IT

Care was taken to retain period feature details for the design and build works including complete strip out of 2 floor and the supply and installation of exposed mechanical and electrical services, reception areas, common areas and toilets.

We also designed the “assembly”; a pop up food and beverage facility for use by tenants of the building and general public alike.

Get in touch, we would love to hear from you!

OTHER PROJECTS